Subdivision Complete Services and Infrastructures

We focus on assisting our clients in achieving profitability
through thorough investigation and designing a desirable
subdivision and layouts that produce a thriving
community.

GALLERY PROJECT

QUALITY CONSTRUCTION

Elitan services include but are not limited to:

  • Project Inception, Feasibility Study, Cost and Report
  • Development Application Processes
  • Obtain Construction Certificate
  • Infrastructure Investigation and Designs
  • Coordinate Sub-consultants & Reporting such as
    Aboriginal cultural heritage, due diligence assessment
    etc
  • Service Authority Application such as Gas, NBN
    Sydney Water etc
  • Tender Stage and Engagement
  • Construction
  • Post Construction
  • Draft Linen & Subdivision Application
  • Subdivision Certificate and Linen Plan

Sample Subdivision

52a Terry Road, Box Hill, NSW
102 mixed lots subdivision with 5 local roads. Subdivision
east next riparian specifications.

Responsibilities:

  • Drainage networks both road and inter-allotment.
  • Preliminary design of portable water.
  • Road design in accordance to The Hills DCP.
  • Sewer network
  • Utility network design
  • Mixed lot calculation
  • Liaise with client and governing authorities