Catchment, Stormwater and Inter-Allotment Drainage
Design and Documentations

Catchment analyses, stormwater network and Water Sensitive Urban Design (WSUD) must be determined and accompany the stormwater management report.
2 type of catchment analysis must be determined and they are:

GALLERY PROJECT

QUALITY CONSTRUCTION

  • Pre Development including consideration of
    permissible site discharge, refer to LGA for
    specifications.
  • Post Development. By increasing the footprint we will
    increase the pre discharge and in order to maintain the
    pre discharge rate we must introduce a detention also
    known as Onsite Detention (OSD).

DO THE JOB QUICKLY

In addition:

  • Investigation of Surrounding Infrastructure
  • Preliminary Connection of Infrastructure Design
  • Report on the condition of Surrounding Infrastructure Documentation
  • Arrange and Coordinate Flood Modelling
  • WSUD: Water Sensitive Urban Design (Music
    Modelling)
  • Pavement Design (Asphalt and concrete)
  • Design and Documentation of Private and Public Road
  • Carpark Design
  • Waste Management
  • Water Supply Management
  • Utilities
  • Waste Treatment Plant Infrastructure
  • Marine Infrastructure
  • Environmental Impact Studies
  • Environmental Management Plans
  • Waste / Site Contamination Assessments
  • Environmental Monitoring, Auditing and Modelling
  • Due Diligence Assessments
  • Sustainability and Carbon Auditing and Reporting