Catchment analyses, stormwater network and Water Sensitive Urban Design (WSUD) must be determined and accompany the stormwater management report.
2 type of catchment analysis must be determined and they are:
Catchment, Stormwater and Inter-Allotment Drainage
Design and Documentations
QUALITY CONSTRUCTION
- Pre Development including consideration of
permissible site discharge, refer to LGA for
specifications. - Post Development. By increasing the footprint we will
increase the pre discharge and in order to maintain the
pre discharge rate we must introduce a detention also
known as Onsite Detention (OSD).
DO THE JOB QUICKLY
In addition:
- Investigation of Surrounding Infrastructure
- Preliminary Connection of Infrastructure Design
- Report on the condition of Surrounding Infrastructure Documentation
- Arrange and Coordinate Flood Modelling
- WSUD: Water Sensitive Urban Design (Music
Modelling) - Pavement Design (Asphalt and concrete)
- Design and Documentation of Private and Public Road
- Carpark Design
- Waste Management
- Water Supply Management
- Utilities
- Waste Treatment Plant Infrastructure
- Marine Infrastructure
- Environmental Impact Studies
- Environmental Management Plans
- Waste / Site Contamination Assessments
- Environmental Monitoring, Auditing and Modelling
- Due Diligence Assessments
- Sustainability and Carbon Auditing and Reporting