Stormwater management report establishes holistic investigation of potential flooding within the proposed site and the potential impact of the development on water quantity within and downstream of the site. This report also investigates the potential impact of the development on stormwater quality and the impact it may have and includes solutions (Water Sensitive Urban Design) to alleviate these potential impacts.
Numerous pieces of information are drawn from various sources to compile this report such as dial before you dig (DB4UD) and liaising with local authorities.
Stormwater Management Report
Elitan’s Sample Completed Projects
Cessnock Correctional Centre Expansion
Project Value: Approx. AUS$450m
- Attend meeting.
- Survey
- Liaise with LGA
- Determine Catchment and Flow Rate
- Investigate natural streams
Engineering Assessment of:
- Stormwater management report, catchment analysis,
- drainage network, coordinate flood modelling
- Australian Golf Club: Roseberry NSW
- Attend meeting.
- Survey
- Liaise with LGA
- Determine Catchment and Flow Rate
- Investigate natural streams- Engineering Assessment of:
- Sewer, stormwater runoff drainage network,
stormwater management report and flood
investigation.