Stormwater Management Report

Stormwater management report establishes holistic investigation of potential flooding within the proposed site and the potential impact of the development on water quantity within and downstream of the site. This report also investigates the potential impact of the development on stormwater quality and the impact it may have and includes solutions (Water Sensitive Urban Design) to alleviate these potential impacts.
Numerous pieces of information are drawn from various sources to compile this report such as dial before you dig (DB4UD) and liaising with local authorities.

GALLERY PROJECT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque nec erat erat. Integer blandit nulla quis fermentum hendrerit.

Elitan’s Sample Completed Projects

Cessnock Correctional Centre Expansion
Project Value: Approx. AUS$450m

  • Attend meeting.
  • Survey
  • Liaise with LGA
  • Determine Catchment and Flow Rate
  • Investigate natural streams

 

Engineering Assessment of:

  • Stormwater management report, catchment analysis,
  • drainage network, coordinate flood modelling
  • Australian Golf Club: Roseberry NSW
  •  Attend meeting.
  • Survey
  • Liaise with LGA
  • Determine Catchment and Flow Rate
  • Investigate natural streams- Engineering Assessment of:
  •  Sewer, stormwater runoff drainage network,
    stormwater management report and flood
    investigation.