Flood is an extremely dangerous and destructive event. It endangers both lives and economic stability of the region.
Flooding occurs with high rainfall and the rate of ground infiltration is slower than the rain downfall. This is stormwater runoff and with the increasing impermeable pavement due to increase in footprint of the land
increases the surface runoff and into our stormwater network and streams.
Elitan is very experienced in investigating and reporting of these events and set up solutions to accommodate these
events.
Flood Investigation and Mitigation
Arrange and Coordination Flood Modelling
Once the investigation and report is completed, free board applied and no definitive solution had been reached due to
local authorities review. Elitan will coordinate all disciplines and implement solutions to overcome the flood
constraint in the development. We will then have to undergo a specific flood modelling with the proposed
footprint design and finished surface level applied.
Elitan can arrange and coordinate the solution with the flood modelling team to determine the best solution and move the project forward.
Elitan’s Sample Completed Projects
Huntley (Greg Norman’s Golf Course) Stage 2 and 3 Flood
Study and Stormwater Management
Project Value: Approx. AUS NA